
Under the national PM Surya Ghar Muft Bijli Yojana, residential households across Gujarat can secure up to 300 units of free electricity per month. This ambitious scheme is designed to lower consumer utility bills while accelerating rooftop solar penetration. For Gujarat homeowners, the application process is routed through the central solar portal and coordinated locally by the Gujarat Energy Development Agency (GEDA) and local DISCOMs like MGVCL, PGVCL, UGVCL, and DGVCL.
This guide explains the subsidy structures, the exact portal workflow, and what to verify before appointing an installer.
The Central Government provides a fixed financial assistance model directly linked to the solar plant's DC capacity. It is highly recommended to install a 3 kW system to maximize the ROI relative to installation overheads.
| System Capacity | Typical Cost Range | Central Subsidy (CFA) | Effective Cost |
|---|---|---|---|
| 1 kW Plant | ₹50,000 - ₹55,000 | ₹30,000 | ₹20,000 - ₹25,000 |
| 2 kW Plant | ₹90,000 - ₹1,00,000 | ₹60,000 | ₹30,000 - ₹40,000 |
| 3 kW (or higher) | ₹1,35,000 - ₹1,50,000 | ₹78,000 (Capped) | ₹57,000 - ₹72,000 |
To register and claim your subsidy, follow this standard workflow:
Before signing a contract, ensure your vendor confirms the following technical details:
No. The PM Surya Ghar Muft Bijli Yojana subsidies apply exclusively to grid-connected (net-metered) rooftop solar systems.
On average, DISCOM feasibility approval is completed within 7 to 15 days of online submission.
As an empanelled partner, the designated vendor (like SunPlus Technologies) handles the net-metering application, layout designs, and synchronization inspections.
Connect with our expert engineering cell for load calculation, subsidy verification, and custom quotation.
Request Site Survey